Mike removes GWR through bolts with grinder, another timber is pushed in, toddington siding 1 07/11/09 640x480 |
Back at Toddington, refurbishment of No 1 siding turnout to parlour road 07/11/09 640x480 |
A view of Laverton concrete deck looking south showing increse in formation height requirement 07/11/09 640x480 |
The bridge at Laverton! Deck now on 07/11/09 640x480 |
The full gang (a big 'un today!) lift and pack another turnout, next week maintenance on siding 1 turnout, Toddington yard 31/10/09 640x480 |
Furthe packing, other half gang picking up scrap and unused components, Toddington yard 31/10/09 640x480 |
Levelling and packing twists and dips on newly laid lines to shed, Toddington 31/10/09 640x480 |
Final redundant crossing removed from unloading line, Toddington yard 31/10/09 640x480 |
Crossing in the process of rebuild,one wing rail replaced, Toddington yard 30/10/09 640x480 |
Both wing rails out, vee rails rebolted and moved up, Toddington yard 30/10/09 640x480 |
Into Todd yard, replacing loose crossing bolts on craned in turnout, bolts cut off, wing rail lifted out 30/10/09 640x480 |
Rails rolled out awaiting removal, switches and crossing to be replaced by plain rail shortly, Toddington South GF 28/10/09 640x480 |
Back to Toddington to return tools and undertake a few other jobs on the "list", removal of stock and closure rails to yard from old south ground frame turnout 28/10/09 640x480 |
Around 1 panel lifted and packed Malvern side only, now need a rabbit cull! Cheltenham RC 28/10/09 640x480 |
Out into the light today, at Cheltenham RC to lift and pack a potential twist, awaiting first train to pass over before jacking 28/10/09 640x480 |
In the tunnel a few broken chairs also changed 27/10/09 640x480 |
Shims fitted to joint, yet another one lifted abd packed, sleeper changed 27/10/09 640x480 |
Into the tunnel, new fishplate bolts fitted, joint lifted and packed 27/10/09 640x480 |
Mike green flags service train past work site 17/10/09 (c) A. Miller 640x480 |
Midweek gang continue to instal (or move) insulated fishplates for thr north Toddington remodelling 21/10/09 (c) Goldbar 640x480 |
A cracking day, weather and accomplishment wise, gang fit final set (?! sic?) of insulated plates on Stanway viaduct 21/10/09 640x480 |
Sorry no updates Saturday, mini half term work week gang swap insulated plates for plain north headshunt siding 26/10/09 640x480 |
11 sleepers changed in running line, a couple more to finish siding 1, Toddington 17/10/09 640x480 |
JCB used to clear cribs, less for us to shovel! 17/10/09 640x480 |
Maintenance on the running line, sleeper changed, awaiting service train to pass, Toddington 17/10/09 640x480 |
A start is made on the replacement of Laverton bridge 16/10/09 640x480 |
Siding 1 (shed access road) has yet more defective sleepers replaced, Toddington 10/10/09 640x480 |
Meanwhile Dowty shed road has rails dropped in, Toddington 10/10/09 640x480 |
Rotten sleepers removed and replaced from Diesel pit road, Toddington 10/10/09 640x480 |
Unloading line leveled and packed, Toddington 10/10/09 640x480 |
Unloading line completed with concrete bullhead sleepers, some fettling to do next week, and finish Dowty shed line 03/10/09 640x480 |
JCB grades area after removal of switch "timbers" 03/10/09 640x480 |
Crossing timbers removed by JCB, ater rails tipped out by hand 03/10/09 640x480 |
Two 60' rails dropped into Dowty shed line, the other rails to be finished, if, and when we complete unloading line 03/10/09 640x480 |
A start is made on removal of B8 left hand turnout and crossing from the unloading line 03/10/09 640x480 |
From the aqueduct looking north toward Broadway, track realigned by midweek gang & JCB. 30/09/09 (c) C. Hawkins 480x640 |
| | | |