Gang 3 more ballasting on the extension, now need more materials 14/06/08
Gang 3 more ballasting on the extension, now need more materials 14/06/08
GWR Permanent Way 2008 Progress
BA's Train Pictures @ fotopic.net
Gotherington south turnout,alterations to enable switch to be moved Mike drills new holes in repostioned timber 21/06/08Previous | NextIn the afternoon 3 fishplates replaced around Stanley Pontlarge, gang 2 collecting sleepers at Didbrook 14/06/08

Added on 14th June 2008, has been viewed 1045 times